SEPTEMBER 20, 2012 |
 |
 |
Pappy Strine, shown here bucking rivets on the P-61
elevator. |
Luke Jones and Pappy Strine install rivets on the
elevator leading edge. |
|
 |
 |
When the elevator is finally finished the fixture
will be modified and reused for rebuilding the wings. |
One of the drop tanks. |
|
 |
 |
Another one of the drop tanks awaits restoration. |
Wiring and hydraulics in the right rear of the turret
compartment. The fuselage carry thru spars can be seen at right. |
|
 |
 |
The gun compartment showing the two lower 20mm cannons
and LH upper gun |
A view of the cannons. |
|
 |
 |
View of the area behind the instrument panel with the
armor plate removed |
Nose gear wiring to control switches and taxi lights |
|
 |
 |
Gunner's turret control box is mounted on the RH gunners
cockpit wall. |
The landing gear selector handle is mounted left of
center on the pilot's sub panel |
|
 |
 |
The flap control handle on the left cockpit wall |
Bail out bell on LH side between pilot and gunner |
|
 |
 |
Ammeter s and circuit breaker box on RH pilots wall. |
RH gunners folding armor plate. Cockpit heater is
installed in the right rear corner. |
|
 |
 |
Gunners LH folding armor plate. |
Propeller switch box ready for installation on the left
cockpit wall. |
|
 |
 |
he throttle quadrant awaits being strung once the wiring
is in place. Mounts for elevator, rudder, and aileron trim wheels. |
More wiring at the instrument panel. Completed harnesses
have cannon plugs installed which are wrapped in plastic. |
|
 |
 |
ilot's instrument panel. The bok to the left contains
the main switch panel. Directly in the center is the autopilot rack. |
The voltage regulator box installed on the bulkhead at
the aft end of the gunner's compartment. |
|
 |
 |
RH turret compartment wiring. Once each bundle is
complete it will be combed out and laced in place |
Wiring on the LH turret compartment buss is in process. |
|
 |
 |
Wiring harness inside the lower right fuselage. This is
mostly radar wiring. |
Right hand nose gear door being fitted |
|
 |
Fitting the new leading edge skin to the elevator |
No comments:
Post a Comment